Skip to content

test: add attaching a third PP network into the CI #43

test: add attaching a third PP network into the CI

test: add attaching a third PP network into the CI #43

Triggered via pull request December 3, 2024 00:14
Status Cancelled
Total duration 10m 52s
Artifacts 1

test.yml

on: pull_request
build-cdk-image
5m 58s
build-cdk-image
Matrix: cdk-e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 5 warnings
cdk-e2e-tests (fork12-validium)
Canceling since a higher priority waiting request for 'test-390' exists
cdk-e2e-tests (fork12-validium)
The operation was canceled.
cdk-e2e-tests (fork11-rollup)
Canceling since a higher priority waiting request for 'test-390' exists
cdk-e2e-tests (fork11-rollup)
The operation was canceled.
cdk-e2e-tests (fork12-rollup)
Canceling since a higher priority waiting request for 'test-390' exists
cdk-e2e-tests (fork12-rollup)
The operation was canceled.
cdk-e2e-tests (fork9-validium)
Canceling since a higher priority waiting request for 'test-390' exists
cdk-e2e-tests (fork9-validium)
The operation was canceled.
build-cdk-image
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
cdk-e2e-tests (fork12-pessimistic)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
cdk-e2e-tests (fork12-pessimistic)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
cdk-e2e-tests (fork12-pessimistic)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
cdk-e2e-tests (fork12-pessimistic)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
cdk
68.1 MB