Skip to content

Merge pull request #104 from markfoodyburton/sc_prim_channel_thread_s… #6

Merge pull request #104 from markfoodyburton/sc_prim_channel_thread_s…

Merge pull request #104 from markfoodyburton/sc_prim_channel_thread_s… #6

Triggered via push December 1, 2024 04:46
Status Failure
Total duration 6h 0m 26s
Artifacts

ubsan.yml

on: push
Matrix: almalinux
Matrix: macos
Matrix: ubuntu
Fit to window
Zoom out
Zoom in

Annotations

11 errors
almalinux (9, linux/amd64, clang-shared-regression-ubsan)
Process completed with exit code 2.
almalinux (8, linux/amd64, clang-shared-regression-ubsan)
Process completed with exit code 2.
ubuntu (20.04, linux/amd64, clang-shared-regression-ubsan)
Process completed with exit code 2.
ubuntu (22.04, linux/amd64, clang-shared-regression-ubsan)
Process completed with exit code 2.
macos (clang-shared-regression-ubsan)
Process completed with exit code 2.
almalinux (9, linux/arm64, clang-shared-regression-ubsan)
Process completed with exit code 2.
almalinux (8, linux/arm64, clang-shared-regression-ubsan)
Process completed with exit code 2.
ubuntu (20.04, linux/arm64, clang-shared-regression-ubsan)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
ubuntu (20.04, linux/arm64, clang-shared-regression-ubsan)
The operation was canceled.
ubuntu (22.04, linux/arm64, clang-shared-regression-ubsan)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
ubuntu (22.04, linux/arm64, clang-shared-regression-ubsan)
The operation was canceled.