chore(deps-dev): bump @types/node from 20.11.24 to 20.12.2 #845
build-test-release.yml
on: pull_request
Matrix: check
Matrix: integration-tests
Matrix: unit-tests
Matrix: deploy
Annotations
10 errors
integration-tests (16.x, ubuntu-latest)
Process completed with exit code 1.
|
integration-tests (20.x, macos-latest)
The job was canceled because "_16_x_ubuntu-latest" failed.
|
integration-tests (16.x, macos-latest)
The job was canceled because "_16_x_ubuntu-latest" failed.
|
integration-tests (16.x, macos-latest)
The operation was canceled.
|
integration-tests (18.x, macos-latest)
The job was canceled because "_16_x_ubuntu-latest" failed.
|
integration-tests (18.x, macos-latest)
The operation was canceled.
|
integration-tests (18.x, ubuntu-latest)
The job was canceled because "_16_x_ubuntu-latest" failed.
|
integration-tests (18.x, ubuntu-latest)
The operation was canceled.
|
integration-tests (20.x, ubuntu-latest)
The job was canceled because "_16_x_ubuntu-latest" failed.
|
integration-tests (20.x, ubuntu-latest)
The operation was canceled.
|