Skip to content

chore(deps-dev): bump @types/node from 20.11.24 to 20.12.4 (#332) #867

chore(deps-dev): bump @types/node from 20.11.24 to 20.12.4 (#332)

chore(deps-dev): bump @types/node from 20.11.24 to 20.12.4 (#332) #867

Triggered via push April 5, 2024 15:59
Status Failure
Total duration 59s
Artifacts
Matrix: check
Matrix: integration-tests
Matrix: unit-tests
Matrix: deploy
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration-tests (20.x, ubuntu-latest)
Process completed with exit code 139.
integration-tests (20.x, macos-latest)
The job was canceled because "_20_x_ubuntu-latest" failed.
integration-tests (20.x, macos-latest)
A task was canceled.
integration-tests (18.x, macos-latest)
The job was canceled because "_20_x_ubuntu-latest" failed.
integration-tests (18.x, macos-latest)
A task was canceled.
integration-tests (18.x, ubuntu-latest)
The job was canceled because "_20_x_ubuntu-latest" failed.
integration-tests (18.x, ubuntu-latest)
The operation was canceled.