Skip to content

Commit

Permalink
Bump icalendar from 6.1.0 to 6.1.1
Browse files Browse the repository at this point in the history
Bumps [icalendar](https://github.com/collective/icalendar) from 6.1.0 to 6.1.1.
- [Release notes](https://github.com/collective/icalendar/releases)
- [Changelog](https://github.com/collective/icalendar/blob/main/CHANGES.rst)
- [Commits](collective/icalendar@v6.1.0...v6.1.1)

---
updated-dependencies:
- dependency-name: icalendar
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <[email protected]>
  • Loading branch information
dependabot[bot] authored Jan 20, 2025
1 parent d0bc3bc commit 5ab8549
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion requirements.txt
Original file line number Diff line number Diff line change
Expand Up @@ -11,7 +11,7 @@ datadog==0.50.2
twilio==9.4.3
pyOpenSSL==25.0.0
Pillow==11.1.0
icalendar==6.1.0
icalendar==6.1.1
pytz==2024.2
python-dateutil==2.9.0.post0
psutil==6.1.1
Expand Down

0 comments on commit 5ab8549

Please sign in to comment.