Skip to content

Merge pull request #9 from neos/task/concurrency-tests #23

Merge pull request #9 from neos/task/concurrency-tests

Merge pull request #9 from neos/task/concurrency-tests #23

Re-run triggered January 15, 2024 16:07
Status Failure
Total duration 1m 22s
Artifacts

php.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (8.3)
Process completed with exit code 2.
build (8.2)
The job was canceled because "_8_3" failed.
build (8.2)
The operation was canceled.
build (8.1)
The job was canceled because "_8_3" failed.
build (8.1)
The operation was canceled.