Skip to content

electrs

electrs #3550

Triggered via schedule December 18, 2024 01:35
Status Failure
Total duration 1m 18s
Artifacts

rust.yml

on: schedule
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 2 warnings
Build (ubuntu-latest, --locked)
Process completed with exit code 101.
Build (windows-latest, --locked --no-default-features)
The job was canceled because "ubuntu-latest_--locked" failed.
Build (windows-latest, --locked --no-default-features)
The operation was canceled.
Build (windows-latest, --locked)
The job was canceled because "ubuntu-latest_--locked" failed.
Build (windows-latest, --locked)
The operation was canceled.
Build (ubuntu-latest, --locked --features metrics_process)
The job was canceled because "ubuntu-latest_--locked" failed.
Build (ubuntu-latest, --locked --features metrics_process)
The operation was canceled.
Build (ubuntu-latest, --locked --no-default-features)
The job was canceled because "ubuntu-latest_--locked" failed.
Build (ubuntu-latest, --locked --no-default-features)
The operation was canceled.
Integration
Process completed with exit code 1.
Build (ubuntu-latest, --locked)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Integration
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636