Skip to content

Dynamic topology phase IV #2128

Dynamic topology phase IV

Dynamic topology phase IV #2128

Triggered via pull request October 3, 2024 22:42
Status Failure
Total duration 27m 0s
Artifacts

build_test.yml

on: pull_request
Matrix: build-deps
Matrix: seacas-build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
seacas-build (gnu, V110, 4.9.2, 4.4.0)
Process completed with exit code 2.
seacas-build (clang, V114, 4.9.2, 4.4.0)
The job was canceled because "gnu_V110_4_9_2_4_4_0" failed.
seacas-build (clang, V114, 4.9.2, 4.4.0)
The operation was canceled.
seacas-build (clang, V110, 4.9.2, 4.4.0)
The job was canceled because "gnu_V110_4_9_2_4_4_0" failed.
seacas-build (clang, V110, 4.9.2, 4.4.0)
The operation was canceled.
seacas-build (mpi, V110, 4.9.2, 4.4.0)
The job was canceled because "gnu_V110_4_9_2_4_4_0" failed.
seacas-build (mpi, V110, 4.9.2, 4.4.0)
The operation was canceled.
seacas-build (gnu, V114, 4.9.2, 4.4.0)
The job was canceled because "gnu_V110_4_9_2_4_4_0" failed.
seacas-build (gnu, V114, 4.9.2, 4.4.0)
The operation was canceled.
seacas-build (mpi, V114, 4.9.2, 4.4.0)
The job was canceled because "gnu_V110_4_9_2_4_4_0" failed.
seacas-build (mpi, V114, 4.9.2, 4.4.0)
The operation was canceled.