chore(deps): bump goschtalt/.github from 1.0.7 to 1.0.10 #7
ci.yml
on: pull_request
ci
/
Check code style
12s
ci
/
Golint Checking
13s
ci
/
REUSE Checking
20s
ci
/
License Checking
1m 44s
ci
/
Build & Test & Report Coverage
44s
ci
/
Update goreportcard.com
22s
Matrix: ci / Build & Test
ci
/
All checks passed check.
14s
Annotations
12 errors
ci / Build & Test (ubuntu-latest, 1.19)
Process completed with exit code 1.
|
ci / Build & Test & Report Coverage
Process completed with exit code 1.
|
ci / Build & Test (macos-latest, 1.19)
The job was canceled because "ubuntu-latest_1_19" failed.
|
ci / Build & Test (macos-latest, 1.19)
Process completed with exit code 1.
|
ci / Build & Test (windows-latest, 1.19)
The operation was canceled.
|
ci / Build & Test (windows-latest, 1.18)
The operation was canceled.
|
ci / Build & Test (ubuntu-latest, 1.18)
The job was canceled because "ubuntu-latest_1_19" failed.
|
ci / Build & Test (ubuntu-latest, 1.18)
The operation was canceled.
|
ci / Build & Test (macos-latest, 1.18)
The job was canceled because "ubuntu-latest_1_19" failed.
|
ci / Build & Test (macos-latest, 1.18)
The operation was canceled.
|
ci / License Checking
Process completed with exit code 1.
|
ci / All checks passed check.
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
licensing
Expired
|
3.09 KB |
|